Application Data
METHOD: Roller and brush
THEORETICAL COVERAGE: 13 m2 / litre
DRYING TIME: Touch Dry – 30 minutes at 30°C
OVERCOATING TIME: 2 hours based on normal conditions
Surface Preparation
Ensure surface is clean, dry and stable using the following suggested surface treatments:
Moisture: There must not be any water residue on the surface of the substrate. Moisture must be <4% (Sovereign moisture master) before application
Unstable matter: Remove loose bonding film, dirt, peeling paint, etc by high-pressure water jet wash or mechanical means such as power brush or scraper, whichever is suitable
Contaminants: Remove dust and foreign matter by cleaning with damp cloth. Remove oil or grease using solvent or mild detergent. Allow surface to dry
Fungus and Algae: Wash the affected area to remove unstable matters and micro-organisms. Apply Anti-Fungus Solution and leave on for at least 2 hours
Hairline cracks: Fill cracks with suitable exterior grade water-resistant putty or filler